The overvoltage-driven blackout of the Iberian Peninsula on 28th April 2025

L. Rouco, F.M. Echavarren, E. Lobato

Sustainable Energy, Grids and Networks Vol. 45, pp. 102125

Resumen:

The Iberian Peninsula blackout on 28th April 2025 occurred due to cascading disconnection of renewable generation with power factor control, triggered by overvoltage generation protections. This paper describes a conceptual model to explain the primary phenomenon that occurred, which we have called an overvoltage-driven blackout. While the phenomenon of voltage collapse, or more precisely undervoltage collapse, is widely discussed in the scientific literature, the phenomenon of an overvoltage-driven blackout is new. An illustrative 3-bus small-scale power system is provided to better understand the evolution of bus voltages in an overvoltage-driven blackout, identifying the critical factors that can lead a power system to a blackout caused by overvoltage. The conceptual model is applied to the state of the Iberian Peninsula electricity system at 12:30 on 28th April 2025, preceding the blackout. The paper will show how, with the loss of renewable generation, the growth of bus voltages exhibits the same pattern as the one identified in the 3-bus small-scale system. A new safety metric (margin to overvoltage-driven blackout) is defined and computed. The paper will demonstrate how the system operated with an insufficient safety margin, leading to an overvoltage-driven blackout, due to a lack of sufficient synchronous reactive power absorption capacity in the central and southern parts of Spain, as well as the low-loaded transmission grid in those regions.


Resumen divulgativo:

Este artículo describe un modelo conceptual para explicar el colapso por sobretensión que provocó el apagón en la Península Ibérica el 28 de abril de 2025. El modelo conceptual se aplica al estado del sistema eléctrico de la Península Ibérica inmediatamente antes del apagón. Se define y calcula el margen de seguridad al colapso por sobretensión.


Palabras Clave: Voltage collapse; Voltage control; Ancillary services


Índice de impacto JCR-JIF y cuartil WoS: 5,700 - Q1 (2025)

Referencia DOI: DOI icon https://doi.org/10.1016/j.segan.2026.102125

Publicado en papel: Marzo 2026.

Publicado on-line: Enero 2026.



Cita:
L. Rouco, F.M. Echavarren, E. Lobato, "The overvoltage-driven blackout of the Iberian Peninsula on 28th April 2025", Sustainable Energy, Grids and Networks, Vol. 45, pp. 102125, Marzo 2026. [Online: Enero 2026] doi: 10.1016/j.segan.2026.102125

    Líneas de investigación:
  • Régimen permanente: Flujos de cargas, análisis de restricciones de operación, flujos de cargas óptimo, servicio complementario de control de tensiones, cortocircuitos, protecciones en redes de transporte y distribución, modelos térmicos de cables
  • Estabilidad: Estabilidad de gran perturbación, ajuste de protecciones de deslastre de cargas por frecuencia, control de la excitación, estabilidad de pequeña perturbación, ajuste de estabilizadores del sistema de potencia, identificación de modelos de reguladores
    Grupos de investigación:
  • Instituto de Investigación Tecnológica (IIT)

pdf Previsualizar
pdf Solicitar el artículo completo a los autores